China Automotive Interior Parts Mould Manufacturer and Supplier | TCT

Automotive Interior Parts Mould

Short Description:

mold engineers have rich design experience and have a comprehensive development concept. The engineers adhere to the tenet of “the soul of the mold lies in the design”, and attach great importance to the mold making process. Carefully designed to provide the longest service life and fewer maintenance molds. Customers only need to provide 2D or 3D renderings or samples in DXF, DWG, PRT, SAT, IGES, STEP and other formats. mold will scan the samples and make product blueprints. Once confirmed by the customer, it can be carried out according to the customer’s existing projects. Mould assembly, drawing design.

The company attaches great importance to technological innovation, and cooperates with a number of colleges and universities in industry, academia and research to give full play to their respective advantages and develop a powerful advanced system integrating research, development and production, and continuously improve the ability of independent innovation. Provide high-quality molds for world-renowned brand auto parts suppliers.


Product Detail

Product Tags

Automotive Interior Parts Mould show

Aumotive Low pressure injection mould show

Automotive Interior Parts Mould show

Equipment

Mould shipping to customer

FAQ

Q: Do you make molds for many automtive lamp parts?
A: Yes, we make molds for many auto parts, such as front auto door and rear auto door; auto door with speaker mesh and auto door w/o speaker meshetc

Q: Do you have injection molding machines to produce parts?
A: Yes, we have our own injection workshop, so we can produce and assemble according to customer requirements.

Question: What kind of mold do you make?
A: We mainly manufacture injection molds, but we can also manufacture compression molds (for UF or SMC materials) and die casting molds.

Q: How long does it take to make a mold?
A: Depending on the product size and the complexity of the parts, it is slightly different. Generally speaking, a medium-sized mold can complete T1 within 25-30 days.

Q: Can we know the mold schedule without visiting your factory?
A: According to the contract, we will send you the mold production plan. During the production process, we will update you with weekly reports and related pictures. Therefore, you can clearly understand the mold schedule.

Q: How do you guarantee the quality?
A: We will appoint a project manager to track your molds, and he will be responsible for each process. In addition, we have QC for each process, and we will also have a CMM and online inspection system to ensure that all components are within tolerance.

Q: Do you support OEM?
A: Yes, we can produce through technical drawings or samples.


  • Previous:
  • Next:

  • Write your message here and send it to us