Processing | Die Casting mold and Die Casting Production |
Trimming | |
Burrs removing | |
Bead blasting/sand blasting/shot blasting | |
Surface polishing | |
CNC machining ,tapping ,turning | |
Degreasing | |
Inspection for size | |
Machinery and test equipments | Die casting machine from 450~1650tons |
CNC Machines 60 sets including brand Brother and LGMazak | |
Drilling machines 6 sets | |
Tapping machines 5 sets | |
Degreasing line | |
Automatic impregnation line | |
Air tightness 8 sets | |
Powder coating line | |
Spectrometer (raw material analysis) | |
Coordinate-measuring machine (CMM) | |
X-RAY ray machine to test air hole or porosity | |
Roughness tester | |
altimeter | |
Salt spray test | |
Application | Aluminum cast motor cases, battery cases of electric vehicles, aluminum covers and bases ,gearbox housings etc. |
Applied file format | Pro/E, Auto CAD ,UG, Solid work |
Lead time | 35-60 days for mold , 15-30 days for production |
Main export market | Western Europe ,Eastern Europe,USA, Canada |
Company advantage | 1) ISO 9001, IATF16949,ISO14000 |
2) Owned die casting and powder coating workshops | |
3) Advanced equipment and excellent R&D Team | |
4) Highly skilled manufacturing process | |
5) A broad variety of ODM&OEM product range | |
6) Strict quality Control System |
Aluminum Casting Design Best Practices: Design for Manufacturing(DFM)
9 Aluminum Die Casting Design Considerations to Keep in Mind:
1. Parting line
2. Shrinkage
3. Draft
4. Wall Thickness
5. Fillets and Radii
6. Bosses
7. Ribs
8. Undercuts
9. Holes and Windows
Q: When did your company start to manufacture the products?
A: We started from the year of 2011.
Q: May I get a free sample?
A: 3~5pcs T1 samples are free , the more quantity parts need to be paid.
Q:What is your Minimum order?
A: Due to our specialty in short run orders, we are very flexible in order quantities.
The MOQ we can accept 100-500pcs /order as trial production ,and will charge setup cost for small volume production .
Q: What is the lead-time of mold and production?
A: Mold 35-60 days ,production 15-30 days
Q: What is your payment terms?
A: We accept T/T .
Q: What certification do you have?
A: We have got ISO and IATF certification .
We have full services except above processing ,we do the surface treatment in house including sandblasting ,chorme plating ,powder coating etc . our goal is to be your preferred partner , welcome to send us the inquiry at info@kingruncastings.com